Commit Graph
5 Commits
Author SHA1 Message Date
thePR0M3TH3AN 7a9b421f18 docs: P4 in progress (watch-history routed); note multi-line lint gap 2026-06-14 16:02:35 -04:00
thePR0M3TH3AN 89d224226c docs: add KNOWN_BUGS.md (deferred defects); mark P3 complete 2026-06-14 15:51:20 -04:00
thePR0M3TH3AN ae8bf6459d docs: mark P2 complete; scope P3 (view-count batching) 2026-06-14 15:06:52 -04:00
thePR0M3TH3AN 9f0541737f docs: mark P1 complete in refactor checklist 2026-06-14 10:19:59 -04:00
thePR0M3TH3ANandClaude Opus 4.8 57902e5cb5 docs: add data-flow refactor dev plan & spec
Incremental, phased plan (P0-P6) to put every subsystem on a shared
SubscriptionManager + RelayHealth foundation with unidirectional data flow,
fixing the O(videos x relays) REQ storms and emit-loop feedback identified
from real-environment logs. No feature removed; each phase shippable.

Co-Authored-By: Claude Opus 4.8 <[email protected]>
2026-06-14 09:55:03 -04:00