Files
bitvid/artifacts/ci-flakes-20260221.md
T
google-labs-jules[bot]andPR0M3TH3AN e46faf2ae9 chore(ci-health-agent): daily CI health check report
- Updated artifacts/ci-flakes-20260221.md with latest run results.
- Added daily completion log.

Co-authored-by: PR0M3TH3AN <[email protected]>
2026-02-21 18:55:41 +00:00

1.1 KiB

CI Health Report - 2026-02-21 (Evening Run)

Summary

  • Agent: ci-health-agent
  • Command: npm run test:unit, npm run test:dm:unit, npm run test:dm:integration
  • Status: PASS (with one timeout)
  • Flakes Detected: 0 (Reliable reproduction failed)

Details

Executed the unit test suite 2 times locally:

  • Run 1: Passed successfully.
  • Run 2: Timed out after 400s. The log ended during tests/nostr/nip46Connector.test.mjs.

Targeted execution of tests/nostr/nip46Connector.test.mjs (10 times) passed reliably and quickly (~30ms per run). The timeout in Run 2 is attributed to environmental load (running multiple suites in parallel or resource contention) rather than a code flake.

DM tests (test:dm:unit, test:dm:integration) passed successfully.

Recommendations

  • Monitor tests/nostr/nip46Connector.test.mjs in CI for potential hangs, though none were reproduced in isolation.
  • tests/visual/overlay-layers.spec.ts contains potential timing issues (waitForTimeout) but was not modified as visual tests cannot be verified in the current environment.