Merge pull request #2457 from PR0M3TH3AN/codex/update-scheduler-prompts-and-meta-prompt

Codex-generated pull request
This commit is contained in:
thePR0M3TH3AN authored and GitHub committed 2026-02-13 12:02:15 -05:00
commit cb7b942c75
3 files changed
+56 -14

No files matched your search

+26 -6
View File
@@ -14,9 +14,18 @@ before choosing a task — is to run these two commands. Not later. NOW.
COMMAND 1 — Check for open daily agent PRs:
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, titles: [.[].title]}'
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, prs: [.[] | {number, title, draft, created_at, head: {ref: .head.ref}, labels: [.labels[].name]}]}'
Review the output. Any title containing "[daily]" means that agent is OFF LIMITS.
Normalize each PR to an agent name using this deterministic rule:
1) Preferred: parse `head.ref` as `agents/daily/<agent-name>/...`
2) Fallback: parse agent name from title only if branch parsing fails
3) If agent cannot be derived from metadata, treat as GLOBAL LOCK warning and do not schedule daily tasks until manually resolved
OFF LIMITS rule: any PR that maps to a daily-cadence agent is excluded, regardless of title tag format.
Valid daily claim branch examples:
- agents/daily/docs-agent/2026-02-13-claim
- agents/daily/test-audit-agent/run-2026-02-13
COMMAND 2 — Check for in-progress task logs:
@@ -31,7 +40,8 @@ STOP HERE. Do not proceed until both outputs are pasted.
---
Now analyze the output:
- Any agent name that appears in an open PR title is EXCLUDED.
- Any PR that maps to a daily-cadence agent is EXCLUDED (branch parsing first, title fallback second).
- If any PR agent cannot be derived from metadata, treat as GLOBAL LOCK warning and do not schedule this cadence.
- Any agent with a "_started.md" log file that has no matching "_completed.md"
or "_failed.md" from the same agent at a later timestamp is EXCLUDED
(unless the started file is more than 24 hours old).
@@ -62,9 +72,18 @@ before choosing a task — is to run these two commands. Not later. NOW.
COMMAND 1 — Check for open weekly agent PRs:
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, titles: [.[].title]}'
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, prs: [.[] | {number, title, draft, created_at, head: {ref: .head.ref}, labels: [.labels[].name]}]}'
Review the output. Any title containing "[weekly]" means that agent is OFF LIMITS.
Normalize each PR to an agent name using this deterministic rule:
1) Preferred: parse `head.ref` as `agents/weekly/<agent-name>/...`
2) Fallback: parse agent name from title only if branch parsing fails
3) If agent cannot be derived from metadata, treat as GLOBAL LOCK warning and do not schedule weekly tasks until manually resolved
OFF LIMITS rule: any PR that maps to a weekly-cadence agent is excluded, regardless of title tag format.
Valid weekly claim branch examples:
- agents/weekly/ci-health-agent/2026-02-weekly-run
- agents/weekly/weekly-synthesis-agent/sprint-07
COMMAND 2 — Check for in-progress task logs:
@@ -79,7 +98,8 @@ STOP HERE. Do not proceed until both outputs are pasted.
---
Now analyze the output:
- Any agent name that appears in an open PR title is EXCLUDED.
- Any PR that maps to a weekly-cadence agent is EXCLUDED (branch parsing first, title fallback second).
- If any PR agent cannot be derived from metadata, treat as GLOBAL LOCK warning and do not schedule this cadence.
- Any agent with a "_started.md" log file that has no matching "_completed.md"
or "_failed.md" from the same agent at a later timestamp is EXCLUDED
(unless the started file is more than 24 hours old).
+15 -4
View File
@@ -76,12 +76,22 @@ If you arrived here from the meta prompt and already ran these commands and past
Run this command:
```bash
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, titles: [.[].title]}'
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, prs: [.[] | {number, title, draft, created_at, head: {ref: .head.ref}, labels: [.labels[].name]}]}'
```
**Paste the complete raw output.** If the command returns nothing or errors, write: `OUTPUT: (empty — no results)`
Review the titles in the output. Every agent name that appears in a PR title containing `[daily]` is **OFF LIMITS** — do not select it.
Normalize each PR to an agent name using this deterministic rule:
1. **Preferred:** parse the branch name from `head.ref` with the convention `agents/daily/<agent-name>/...`.
2. **Fallback:** only if branch parsing fails, parse `<agent-name>` from the PR title.
3. If an agent cannot be derived from PR metadata, treat that PR as a **global lock warning** and do not schedule any daily agent until manually resolved.
Examples of valid daily claim branch names (all parseable):
- `agents/daily/docs-agent/2026-02-13-claim`
- `agents/daily/test-audit-agent/run-2026-02-13`
- `agents/daily/prompt-curator-agent/task-rotation-fix`
**OFF LIMITS rule:** any PR that maps to an agent in the **daily cadence** is excluded, regardless of title tag format.
### COMMAND 2 — Check the task log for incomplete runs
@@ -98,6 +108,7 @@ Look for any `_started.md` files that do NOT have a corresponding `_completed.md
Combine results from Commands 1 and 2:
- Agents with open/draft PRs → EXCLUDED
- PRs whose agent cannot be derived from metadata → GLOBAL LOCK (stop scheduling this cadence)
- Agents with `started` status less than 24 hours old (no matching `completed`/`failed`) → EXCLUDED
Write your exclusion list explicitly:
@@ -169,7 +180,7 @@ You must create a visible claim before doing any work. This claim is a **distrib
After pushing, re-check for competing claims:
```bash
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, titles: [.[].title]}'
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, prs: [.[] | {number, title, draft, created_at, head: {ref: .head.ref}, labels: [.labels[].name]}]}'
```
If you see another PR for this agent that was created *before* yours, abandon your branch and go back to Step 1 to select the next agent.
@@ -276,7 +287,7 @@ Use the current UTC timestamp (which will be later than the `started` file). The
| Layer | Mechanism | Catches |
|-------|-----------|---------|
| **Pre-flight gate** | Scan ALL open `[daily]` PRs via `curl` | Agents claimed by any platform |
| **Pre-flight gate** | Scan ALL open PR metadata via `curl` + deterministic agent mapping | Agents claimed by any platform |
| **Pre-flight gate** | Check task log dir for `started` files | Agents in progress (even without PR) |
| **Step 2a** | Push branch with claim commit | Cross-platform visibility |
| **Step 2b** | Race condition re-check | Simultaneous claims |
+15 -4
View File
@@ -76,12 +76,22 @@ If you arrived here from the meta prompt and already ran these commands and past
Run this command:
```bash
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, titles: [.[].title]}'
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, prs: [.[] | {number, title, draft, created_at, head: {ref: .head.ref}, labels: [.labels[].name]}]}'
```
**Paste the complete raw output.** If the command returns nothing or errors, write: `OUTPUT: (empty — no results)`
Review the titles in the output. Every agent name that appears in a PR title containing `[weekly]` is **OFF LIMITS** — do not select it.
Normalize each PR to an agent name using this deterministic rule:
1. **Preferred:** parse the branch name from `head.ref` with the convention `agents/weekly/<agent-name>/...`.
2. **Fallback:** only if branch parsing fails, parse `<agent-name>` from the PR title.
3. If an agent cannot be derived from PR metadata, treat that PR as a **global lock warning** and do not schedule any weekly agent until manually resolved.
Examples of valid weekly claim branch names (all parseable):
- `agents/weekly/ci-health-agent/2026-02-weekly-run`
- `agents/weekly/telemetry-agent/report-refresh`
- `agents/weekly/weekly-synthesis-agent/sprint-07`
**OFF LIMITS rule:** any PR that maps to an agent in the **weekly cadence** is excluded, regardless of title tag format.
### COMMAND 2 — Check the task log for incomplete runs
@@ -98,6 +108,7 @@ Look for any `_started.md` files that do NOT have a corresponding `_completed.md
Combine results from Commands 1 and 2:
- Agents with open/draft PRs → EXCLUDED
- PRs whose agent cannot be derived from metadata → GLOBAL LOCK (stop scheduling this cadence)
- Agents with `started` status less than 24 hours old (no matching `completed`/`failed`) → EXCLUDED
Write your exclusion list explicitly:
@@ -164,7 +175,7 @@ You must create a visible claim before doing any work. This claim is a **distrib
After pushing, re-check for competing claims:
```bash
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, titles: [.[].title]}'
curl -s "https://api.github.com/repos/PR0M3TH3AN/bitvid/pulls?state=open&per_page=100" | jq '{count: length, prs: [.[] | {number, title, draft, created_at, head: {ref: .head.ref}, labels: [.labels[].name]}]}'
```
If you see another PR for this agent that was created *before* yours, abandon your branch and go back to Step 1 to select the next agent.
@@ -273,7 +284,7 @@ Use the current UTC timestamp (which will be later than the `started` file). The
| Layer | Mechanism | Catches |
|-------|-----------|---------|
| **Pre-flight gate** | Scan ALL open `[weekly]` PRs via `curl` | Agents claimed by any platform |
| **Pre-flight gate** | Scan ALL open PR metadata via `curl` + deterministic agent mapping | Agents claimed by any platform |
| **Pre-flight gate** | Check task log dir for `started` files | Agents in progress (even without PR) |
| **Step 2a** | Push branch with claim commit | Cross-platform visibility |
| **Step 2b** | Race condition re-check | Simultaneous claims |